 |
|
|
DETENTION glazing protection levels |
| |
 |
 |
| |
| Click here to view Detention/Containment Product Page. |
| |
| H.P. White TP-0500.02 Forced Entry Test Procedure |
| |
| Phase II-Forced Entry |
Level I |
Level II |
Level III |
Level IV |
Level V |
Blunt Impacting (Impacts)
Sledgehammer / Wedge (25)
4” diameter Pipe / Sledge (25)
Ram (1)
Pinch Bar (a)
|
1,4
2
N/A
|
8,10
7
6
|
18,24,26
17
16
|
29,32,39
28
27
|
42,45,48,51,54
41
40
|
Sharp Tool (Impacts)
Chisel / Hammer (25)
Angle Iron / Sledge (25)
1 1/2” Diameter Pipe / Sledge (25)
Fire Axe (25)
Wood Maul (25)
Keyhole Saw (b)
Hacksaw (b)
|
N/A
N/A
5
N/A
N/A
|
12
13
N/A
N/A
15
|
21,23
22
N/A
N/A
20
|
33,36,38
N/A
N/A
35
31
|
47,52
N/A
N/A
44,50
46,53
|
Thermal Stress (Minutes)
Extinguisher, CO2 (1)
Propane Torch
Acetylene (5)
|
3
N/A
N/A
|
9
11
N/A
|
N/A
19
N/A
|
N/A
30
N/A
|
N/A
N/A
43
|
Chemical Deterioration (Amount)
Gasoline (1/2 Pint)
Windshield Washer (1/2 pint)
Acetone (1/2 Pint)
|
N/A
N/A
N/A
|
14
N/A
N/A
|
N/A
25
N/A
|
N/A
34
37
|
N/A
N/A
49
|
Total Forced Entry
Sequences
|
5 |
15 |
26
|
39 |
54 |
|
|
| |
- Pinch or ripping bars may be substituted for any portion of Blunt Impacting Sequences at rate of 1 minute for each of 5 impacts (Test Director option).
- Additional sequences of one minute intervals in conjunction with all Sharp Tool Sequences except sequences 5 and 15 (see Paragraph 5.6-5.7 Section III).
|
| |
| WMFL Test Procedure (Ballistic/Physical/Flame Attack) |
| |
| Attack Sequence Summary |
Level I
Ballistic & 60 Minutes
Physical Attack |
Level II
60 Minutes
Physical Attack |
Level III
30 Minutes
Physical Attack |
| .44 Magnum, 240 Grain |
25 Rounds |
N/A
|
N/A |
| 2lb. Claw Hammer |
5 minutes |
5 minutes
|
5 minutes |
| 10 lb. Sledgehammer |
5 minutes |
5 minutes
|
5 minutes |
| Cold Chisel / Screwdriver |
5 minutes |
5 minutes
|
5 minutes |
| 1 ½” x 3” Pipe with 2”x2”x3” Angle Iron |
5 minutes |
5 minutes
|
N/A |
| #8 Reinforcing Bar, 3” Long |
5 minutes |
5 minutes |
N/A |
| 4”x4”x3” Long (oak) Leg |
5 minutes |
5 minutes |
N/A |
| Fire Extinguisher (chemical dry) |
5 minutes |
5 minutes |
5 minutes |
| 10 lb. Sledgehammer |
5 minutes |
5 minutes |
N/A |
| Clothes Hanger/Knife, Heated 10” Blade 1/4” Thick |
5 minutes |
5 minutes |
N/A |
| Propane Burner (2200 degrees F) |
5 minutes |
5 minutes |
5 minutes |
| 4 lb. Hammer |
5 minutes |
5 minutes |
5 minutes |
| 3”x3”Pipe with 1”x1”x3” Angle Iron |
5 minutes |
5 minutes |
N/A |
|
|
| |
| ASTM F 1915-03 Standard Test Methods for Glazing for Detention Facilities |
| |
| Security Grade |
Time Rating |
Sequence 1
Blunt Impactor |
Sequence 2
Sharp Impactor |
Sequence 3
Blunt Impactor |
Total Number
of Impacts |
| 1 |
60 minutes |
150 |
300 |
150 |
600 |
| 2 |
40 minutes |
100 |
200 |
100 |
400 |
| 3 |
20 minutes |
50 |
100 |
50 |
200 |
| 4 |
10 minutes |
25 |
50 |
25 |
100 |
|
|
| |
 |
| |
|
|
| Copyright © Global Securiy Glazing. All rights reserved. |
|