Global Security Glazing Security Glazing Glass
 

DETENTION glazing protection levels

 
 
Click here to view Detention/Containment Product Page.
 
H.P. White TP-0500.02 Forced Entry Test Procedure
 
Phase II-Forced Entry Level I Level II Level III Level IV Level V
Blunt Impacting (Impacts)
Sledgehammer / Wedge (25)
4” diameter Pipe / Sledge (25)
Ram (1)
Pinch Bar (a)
1,4
2
N/A
8,10
7
6
18,24,26
17
16
29,32,39
28
27
42,45,48,51,54
41
40
Sharp Tool (Impacts)
Chisel / Hammer (25)
Angle Iron / Sledge (25)
1 1/2” Diameter Pipe / Sledge (25)
Fire Axe (25)
Wood Maul (25)
Keyhole Saw (b)
Hacksaw (b)

N/A
N/A
5
N/A
N/A

12
13
N/A
N/A
15

21,23
22
N/A
N/A
20

33,36,38
N/A
N/A
35
31

47,52
N/A
N/A
44,50
46,53
Thermal Stress (Minutes)
Extinguisher, CO2  (1)
Propane Torch
Acetylene (5)
3
N/A
N/A
9
11
N/A
N/A
19
N/A
N/A
30
N/A
N/A
N/A
43
Chemical Deterioration (Amount)
Gasoline (1/2 Pint)
Windshield Washer (1/2 pint)
Acetone (1/2 Pint)
N/A
N/A
N/A
14
N/A
N/A
N/A
25
N/A
N/A
34
37
N/A
N/A
49
Total Forced Entry
Sequences
5 15 26 39 54
 
  1. Pinch or ripping bars may be substituted for any portion of Blunt Impacting Sequences at rate of 1 minute for each of 5 impacts (Test Director option).
  2. Additional sequences of one minute intervals in conjunction with all Sharp Tool Sequences except sequences 5 and 15 (see Paragraph 5.6-5.7 Section III).
 
WMFL Test Procedure (Ballistic/Physical/Flame Attack)
 
Attack Sequence Summary Level I
Ballistic & 60 Minutes
Physical Attack
Level II
60 Minutes
Physical Attack
Level III
30 Minutes
Physical Attack
.44 Magnum, 240 Grain 25 Rounds N/A N/A
2lb. Claw Hammer 5 minutes 5 minutes 5 minutes
10 lb. Sledgehammer 5 minutes 5 minutes 5 minutes
Cold Chisel / Screwdriver 5 minutes 5 minutes 5 minutes
1 ½” x 3” Pipe with 2”x2”x3” Angle Iron 5 minutes 5 minutes N/A
#8 Reinforcing Bar, 3” Long 5 minutes 5 minutes N/A
4”x4”x3” Long (oak) Leg 5 minutes 5 minutes N/A
Fire Extinguisher (chemical dry) 5 minutes 5 minutes 5 minutes
10 lb. Sledgehammer 5 minutes 5 minutes N/A
Clothes Hanger/Knife, Heated 10” Blade 1/4” Thick 5 minutes 5 minutes N/A
Propane Burner (2200 degrees F) 5 minutes 5 minutes 5 minutes
4 lb. Hammer 5 minutes 5 minutes 5 minutes
3”x3”Pipe with 1”x1”x3” Angle Iron 5 minutes 5 minutes N/A
 
ASTM F 1915-03 Standard Test Methods for Glazing for Detention Facilities
 
Security Grade Time Rating Sequence 1
Blunt Impactor
Sequence 2
Sharp Impactor
Sequence 3
Blunt Impactor
Total Number
of Impacts
1 60 minutes 150 300 150 600
2 40 minutes 100 200 100 400
3 20 minutes 50 100 50 200
4 10 minutes 25 50 25 100
 
Global Security Glazing